Tag: Shop floor execution
-

The Schedule Said Start. The Shop Floor Said Not Yet.
A production order can be scheduled and released without being ready to run. Reliable execution begins when material, equipment, tooling, people, quality status, and downstream capacity are aligned before the order reaches the shop floor.